Boilers Reference List

References in pdf

Company Reference Parameteres m0 [t/h]/t0 [°C]/p0 [MPa] Fuel Project / Site Pc Year of Realization
S.I.I.C Cairo Fuel lines for 90 burners 54/380/26 NG Egypt 1 2012
S.I.I.C Cairo Delivery of boiler burners 54/380/25 NG Egypt 1 2012
ELSACO Delivery of 2 HW boilers 2 x 58 MW Gas/Heavy fuel oil Romania 1 2012
Energie Holding a.s. Boiler reconstruction 20/445/3,63 Coal Czech Republic 1 2012

Belarus

Cogeneration equipment with technology for salt drying 14/240/0,8 Flue gas Belarus 1 2012
S.I.I.C Cairo Delivery of burners for 9 boilers 30/380/2,5 Gas/Heavy fuel oil Egypt 1 2010
CHEKA Sugar Company Boiler reconstruction 25/400/3,5 Heavy fuel oil Lebanon 1 2010
 S.I.I.C Cairo Exchange of the combustion devices of 9 boilers  30÷0/380/2,6 Heavy fuel oil + natural gas Abou Kourkas / EGYPT 1 2010
 CHEKA Sugar Company Reconstruction of the boiler – replacement of the superheater  25/400/3,5  Heavy fuel oil Lebanon 1 2010
 HOMS Sugar Company Reconstruction of the boiler – exchange of the superheater  35/380/2,8  Heavy fuel oil Syria 1 2010 
CHETENG Heat recovery steam generator B302 B302 4/360/6,3 HRSG Belarus 1 2010
NAFTAN Heat recovery steam generator B201 B201 11/360/4,0 HRSG Belarus 1 2010
S.I.I.C Cairo Delivery of the burners of the  ČKD-30 boiler 30/380/2,6 Heavy fuel oil, bagasse Hawandia / Egypt 1 2010
S.I.I.C Cairo Delivery of the burners of the  Mitsubishi boiler 30 / 380 / 2,6 Heavy fuel oil, bagasse Hawandia / Egypt 1 2009
SC Confort Timiossara Engineering, delivery, supervision of assembly, setting in operation of the Horká voda Natural gas Timiossara / Romania 1 2007
S.I.I.C Delivery of the spare parts of the boiler (membrane) 100 / 380 / 2,6 Bagasse + heavy fuel oil, KOMOMBO / Egypt 1 2007
S.I.I.C Cairo Nile Sugar Delivery of two boilers with economizer 80 / 450 / 4,5 Natural gas Alexandria / Egypt 1 2007
S.I.I.C Cairo Delivery of two boiler drumms of the  Mitsubishi boiler Bagasse Hawandia / Egypt 1 2006
S.I.I.C Cairo Delivery of new boiler drumms and accesories of the  Mitsubishi boiler 30 / 380 / 2,6 Heavy fuel oil, bagasse Edfu / Egypt 1 2006
S.I.I.C Cairo Delivery of the burners of the  Mitsubishi boiler 30 / 380 / 2,6 Heavy fuel oil, bagasse Hawandia / Egypt 1 2006
|< < 1 2 3 4... > >|
 

EKOL Brno


EKOL, spol. s r.o. is a respected European manufacturer and supplier of heat and power generating plants...


+420 543 531 710

Send e-mail to us
Conference Boilers and Power...

The 28th conference Boilers and Power Plants...

Update: 01.04.2019