Company | Reference | Parameteres m0 [t/h]/t0 [°C]/p0 [MPa] | Fuel | Project / Site | Pc | Year of Realization |
---|---|---|---|---|---|---|
SC Confort Timiossara | Engineering, delivery, supervision of assembly, setting in operation of the | Horká voda | Natural gas | Timiossara / Romania | 1 | 2007 |
S.I.I.C | Delivery of the spare parts of the boiler (membrane) | 100 / 380 / 2,6 | Bagasse + heavy fuel oil, | KOMOMBO / Egypt | 1 | 2007 |
S.I.I.C Cairo Nile Sugar | Delivery of two boilers with economizer | 80 / 450 / 4,5 | Natural gas | Alexandria / Egypt | 1 | 2007 |
S.I.I.C Cairo | Delivery of two boiler drumms of the Mitsubishi boiler | Bagasse | Hawandia / Egypt | 1 | 2006 | |
S.I.I.C Cairo | Delivery of new boiler drumms and accesories of the Mitsubishi boiler | 30 / 380 / 2,6 | Heavy fuel oil, bagasse | Edfu / Egypt | 1 | 2006 |
S.I.I.C Cairo | Delivery of the burners of the Mitsubishi boiler | 30 / 380 / 2,6 | Heavy fuel oil, bagasse | Hawandia / Egypt | 1 | 2006 |
S.I.I.C Cairo | Delivery of the new boiler drumms and accesories of the Babcock and Wilcox boiler | 30 / 380 / 2,6 | Heavy fuel oil, bagasse | Hawandia / Egypt | 1 | 2006 |
S.I.I.C Cairo | Delivery of the boiler drumms of the Weiss boiler | 12/nasycená pára/1,2 | Heavy fuel oil, bagasse | KOMOMBO / Egypt | 1 | 2006 |
S.I.I.C Cairo | Delivery of the 100 t/h bagass boiler | 100 / 380 / 2,6 | Bagasse | Armant / Egypt | 1 | 2006 |
S.I.I.C. Cairo | Delivery of the 100 t/h bagass boiler | 100 / 380 / 2,6 | Bagasse | KOMOMBO / Egypt | 1 | 2004 |
S.I.I.C. Cairo | Delivery of 2 boiler drumms for Mitshubishi boiler. |
Bagasse | HAWAMDIA / Egypt | 1 | 2004 |
EKOL, spol. s r.o. is a respected European manufacturer and supplier of heat and power generating plants...
30 years of ShaanGu EKOL company
Video links in
CZE,
PL,
ARAB
Bioelectric plant in Sviadnov
Video links in
CZE,
GER