GT 750-6 gas turbine air intake and exhaust gas piping modification at the gas pipeline compressor plant. Repla-cement of sheet recuperators for tubu-lar recuperators for higher efficiency and longer service life. Replacement of cloth filter for cartrige filters in the intake duct. Installation of two waste-heat boilers – 3 MW each.
 

EKOL Brno


EKOL, spol. s r.o. is a respected European manufacturer and supplier of heat and power generating plants...


+420 543 531 710

Send e-mail to us
Join us in Istanbul IICI 2018

The ICCI 2018 Fair and Conference will present a general outlook on the...

Update: 20.04.2018